Before You Start

The spreadsheets work. That is the whole reason they are still there, and the person who built them has kept the company running on them for years. The problem is not inefficiency, it is concentration. One author holds the logic, nobody has checked a formula in four years, two people cannot edit at once without one of them losing an hour, and when a number is wrong there is no record of who changed it or when. This guide is about moving the load off those workbooks in an order that does not lose what is in them.

Find every spreadsheet that runs something

Start with a census, not a plan. Walk the shop and the office and write down every workbook that something downstream depends on. The quote builder, the on-hand sheet, the job tracker, the vendor price list, the shipping log, the one tab that works out material cost per pound. For each one, record four things: who owns it, what decision it drives, who else reads it, and what breaks if it is wrong for a week.

That last column is the one that matters and the one people skip. A workbook that is wrong for a week and nobody notices is a workbook you can leave alone for now. A workbook that is wrong for a week and you quote three jobs under cost is the reason you are reading this.

Expect the census to turn up things nobody mentioned. There will be shadow copies, a version on someone's desktop with an extra column, saved there because the shared one was open. There will be a workbook that was emailed out eighteen months ago and is now the version two people work from. There will be a sheet whose author has left, which still runs because nobody has had a reason to open the formulas. Write all of them down. You are not auditing anyone; you are finding the load paths.

Ask the owner of each workbook one question: what would you have to explain to somebody who had to run this for a month without you. The answer is the undocumented logic, and it is the part no import touches.

The artefact is a single list of workbooks ranked by what breaks when they are wrong, with an owner's name on every line. That list sets the migration order. Nothing else does.

What Good Looks Like

You can name the three workbooks that would stop shipping if they were wrong on Monday, and someone other than their author can say what each one decides. Anything you cannot rank, you have not found yet.

Decide which numbers are the real ones

The hard part of leaving spreadsheets is not the import. It is adjudication. Two workbooks hold the same on-hand quantity for the same part and they disagree, and both of them have been right at some point this year. One was right before the last physical count; the other was right before somebody received a partial shipment against it. No formula settles that. A person has to decide.

Do the deciding before anything moves, and do it in writing. Take the field list you are about to import, which is roughly item number, description, unit of measure, standard cost, on-hand quantity, reorder point, customer price and lead time, and name one winning source per field. The quote builder might own price while the stock sheet owns quantity and the purchasing log owns lead time. Write it as a one-page table and have the owners of the losing workbooks read it. Disagreement surfaces now, or it surfaces as a wrong number in a live system in six weeks.

Some fields will not have a defensible source, and on-hand quantity is usually one of them. Do not import a number you do not believe. Count it. A physical count on the parts that matter is a day or two of work and it gives you an opening balance you can stand behind, which is worth more than a reconciled guess. For the long tail of low-value hardware, cycle counting after go-live is fine.

The artefact is a signed field-to-source map and a counted opening inventory. Costing, planning and variance all read from those numbers, so this is the one decision in the project you should expect to be slow.

What Good Looks Like

Every field in the import has exactly one named source workbook, and the people who own the workbooks that lost have read the list. On-hand quantities were counted, not copied.

Import items, BOMs, and open orders

Load in dependency order: items first, then bills of material, then routings if you have them, then open orders. A bill of material is a list of items, so it cannot exist before they do, and an open order points at a part and its bill, so it goes last. Trying to do it in one pass produces rows that reference nothing.

The item master is the slow part, and slower than you think. Spreadsheets tolerate things a database will not. The same bracket appears as BRK-100, BRK100 and BRK-100 REV B. One sheet counts sealant in tubes and another in millilitres. Descriptions carry a revision inside the text. Clean that in the workbook, where you have find-and-replace and the person who knows which duplicate is real, rather than after it is loaded. Settle one identifier per part and one unit of measure per item before a single row moves.

Bills come next, and a flat export is usually hiding structure: a sub-assembly that was only ever a blank row and an indent. Decide where the levels are. Then open orders, stated as the quantity still due rather than the quantity originally ordered, because what you need is a position and not a history.

Historical job costs usually do not come across, and that is a decision rather than a failure. Rebuilding four years of actuals from formulas nobody has verified gives you precise numbers that are quietly wrong, and those become the numbers you quote from. Keep the old workbook readable instead and start the cost history clean.

The artefact is a loaded item master with one identifier and one unit per part, bills that resolve to real items, and open orders carrying remaining quantity.

What Good Looks Like

A part number means one thing, in one unit of measure, everywhere. Every bill resolves to items that already exist, and every open order shows the quantity still owed rather than the quantity first ordered.

Retire the workbook on purpose

Pick a date. Say out loud, to everyone, that after that date the sheet is no longer where anything gets decided. A migration without a stated cut date does not end. It becomes a second system that somebody keeps feeding, and the shop pays twice to maintain two versions of the truth that drift apart quietly.

Short parallel running is reasonable. Two weeks where the same receipts and the same job time land in both places, so you can compare and catch the column you mapped wrong, is cheap insurance. Two months is not insurance, it is a habit, and by then people have decided which one they trust and it is usually the one they built. If you extend the parallel window, say why in one sentence and name the new date.

On the cut date, do not delete anything. Make the workbook read-only, move it somewhere obvious with a date in the filename, and tell people it is there and that it is history rather than a working copy. You will want it. Somebody will ask in March how a job from last year was priced, and the answer lives in that file. Stripping the formulas out is not necessary; locking the file is.

Then close the loop on the census from the first chapter. Walk the ranked list and mark each workbook retired, kept as a reference, or still live on purpose with a reason next to it. A few will stay live, and that is fine. An estimator's scratch worksheet is a thinking tool, not a system of record.

The artefact is an archived read-only copy of every retired workbook, a cut date people can name, and a census where every line has an outcome written beside it.

What Good Looks Like

Nobody has to ask which version is current, because the old workbook opens read-only with a date in its name, and every line of the census says retired, reference, or live on purpose.

Frequently Asked Questions

How long does moving from spreadsheets to an ERP take?

Longer than the import and shorter than you fear, and the variable is your item master rather than the software. Cleaning duplicates, units of measure and part numbers is most of the calendar. Decide the field-to-source question first, count the inventory that matters, then load in dependency order. The loading itself is usually days, not months.

Can I import my spreadsheets straight into an ERP?

The mechanics are usually straightforward: export to CSV, map columns, load. What stops people is that the sheet holds three spellings of one part number, two units for one material, and a column whose meaning only its author knows. Fix those in the workbook before you export. A clean import of dirty data is still dirty data.

What about years of job history in my workbooks?

Plan to leave it where it is. Rebuilding historical job costs means trusting formulas nobody has checked in years, and the result is precise numbers that may be quietly wrong, and those are the numbers you would quote from. Archive the workbook read-only so you can still answer a question about an old job, and start the cost history clean.

Should I run spreadsheets and the new system together?

For a couple of weeks, yes. Dual entry on receipts and job time catches a bad column mapping while it is still cheap to fix. Beyond that it stops being a check and becomes two systems. Set the parallel window and the cut date at the same time, and if you extend it, name the new date.

Which spreadsheet should I replace first?

The one with the worst consequence when it is wrong, which is rarely the most annoying one. Rank your workbooks by what breaks if they are wrong for a week. A sheet that misprices quotes outranks a shipping log that is tedious to keep. Replace in that order and the early wins are the ones people feel.