[Templates]
The forms, in the format the auditor expects.
Control plans, PFMEAs, first article reports, and the other forms your customers audit you against.
Templates3 Available
| Template | Standard | What It Is |
|---|---|---|
| AS9102 First Article Inspection Template | AS9102 | The three AS9102 forms: part number accountability, raw material and special process certification, and characteristic accountability ballooned to the drawing. |
| Control Plan Template | IATF 16949 | The IATF 16949 control plan format: characteristic, specification, measurement method, sample size and frequency, and the reaction plan when it goes out. |
| PFMEA Template | IATF 16949 | Process failure mode and effects analysis, with severity, occurrence and detection scored into an RPN and the actions that bring it down. |
A Template Is A Starting PointCompliance
A blank form in the right format gets you through the first audit. Keeping it filled in, revision after revision, is the part that takes a system.
In WorkCell these are not documents you maintain on the side. The characteristics live on the part, the results land on the operation, and the report comes out of the records you already kept.
[Templates]
Stop maintaining the form by hand.
See how WorkCell keeps these records as a by-product of running the job.