Getting Audit Ready

The records an auditor asks for, and how to keep them as a by-product of running the job.

WorkCell TeamPublished
Before You Start

Audit readiness is not a project you run in the three weeks before an auditor arrives. It is a property of how you record work the rest of the year. If the evidence has to be assembled, you are not ready; you are just fast at assembling, and that speed costs you a fortnight of your best people every cycle. The shops that find audits boring are not the ones with the thickest binders. They are the ones where the record an auditor wants was created by the person doing the job, at the moment the job happened, and never moved.

Map the standard to the records you keep

Start with the document you are actually measured against. Whatever your certificate commits you to, and whatever your customers add on top of it through quality clauses on their purchase orders, it reads as a list of requirements, and each requirement implies a record somebody has to be able to hand over. The artefact you want is a two-column map. On the left, each requirement in the order the standard states it. On the right, the specific record that satisfies it, where it lives, who owns it, and how far back it goes.

Write the right-hand column in the language of your shop rather than the language of the standard. Documented information on monitoring and measuring resources is not a record. Calibration certificates for the CMM and the thread gauges, one per gauge per interval, in the quality share, owned by the quality lead, is a record. If you cannot name the file, the table, or the drawer, you have found a gap, and a gap found by you now is worth far more than the same gap found by somebody else in three weeks.

Then stop rebuilding it. Most shops reconstruct this map from memory every cycle under a date, which is exactly why the cycle hurts. Maintained as a living document, it becomes the thing you update when you add a process, qualify a supplier, or take on a customer whose contract brings requirements of its own. Retention belongs on the map too: how long you hold each record comes from the standard, from any regulator with jurisdiction over your product, and from the contract, so write the source beside the period instead of applying one number to everything.

Review it when something changes, not when the audit letter arrives.

What Good Looks Like

Hand the map to somebody who did not write it and name three requirements. If they can locate each record from the map alone, without asking you where it lives or who has the password, the map is real.

Put inspection results on the operation

An auditor picks a finished part and asks four things: who checked it, when, against which revision of the drawing, and with what gauge. If your inspection results live in a parallel log, a spreadsheet with a tab per month or a binder on the inspector's desk, answering means correlation. Somebody matches a date and a part number across two records while the auditor watches. That reconciliation is the binder scramble in miniature, and it exists only because the evidence was written somewhere other than where the work happened.

Attach the result to the operation that produced it. The record of the second op carries its own inspection: the characteristic checked, the specification and tolerance it was checked against, the actual reading rather than the word acceptable, the gauge identifier, the person who took it, and the timestamp. Nothing has to be matched up afterwards because nothing was ever apart. The same capture covers the first-piece check at setup, in-process checks on an interval, and final inspection, each sitting on the step it belongs to.

Capture at the point of work or you will not capture it at all. A terminal at the machine, a tablet at the bench, whatever the operator already has within reach. The honest test is whether recording a reading takes less effort than skipping it. Evidence written up at the end of a shift from memory is the weakest record you can hold and the one most likely to be missing on the day that part gets pulled. Nonconformances follow the same rule: the report references the operation and the actual reading that failed, so the disposition a review board later renders traces back to a measurement instead of a recollection.

What Good Looks Like

Pull a part at random and ask who checked it, when, and against what revision. If the answer comes off one record, with nobody opening a second system or phoning the inspector, inspection is on the operation.

Keep revisions instead of overwriting them

The question that exposes an overwriting system is simple. What revision was this part built to in March, and what did the operator have in front of him at the time? If your bill of materials and your routing are single records edited in place, there is no answer. The current version is the only version, and it is the wrong one for every job that ran before the last edit. You end up inferring history from purchase orders and stock movements, which is the weakest kind of evidence because it is reconstruction rather than record.

Keep revisions as separate records with effective dates. Revision B supersedes revision A on a date; A is still there, still readable, still attached to every job that consumed it. The same discipline applies to the routing, to the work instruction, and to the drawing or specification each step points at. A job then carries the revision it was released against, so the March question becomes a lookup instead of an investigation, and a change made in June cannot retroactively make a conforming part look nonconforming.

This is also how you demonstrate change control rather than assert it. A controlled change has an author, a reason, an approval, and an effective date, and the superseded version stays in the record to prove the change was a change and not a quiet correction. The operator-facing half matters just as much. If the drawing at the station is a printout, the record has to show which revision was issued to that station and when the obsolete copy came back. Uncontrolled copies in circulation is a finding that writes itself, and it is a finding about housekeeping rather than about engineering.

What Good Looks Like

Open a job that shipped last quarter and look at the bill of materials it was built to. If you are looking at today's revision rather than the one in effect that week, you are overwriting your own history.

Pull a traceability report on demand

The final test is mechanical. Take one serial number or one lot off a shipment and walk it in both directions without assembling anything. Backwards: the job that built it, the operations and inspection results on that job, the material issued to it, the receipt that material arrived on, the supplier, and the certificate of conformance or mill certificate that came with the receipt. Forwards: every assembly that serial went into, every shipment it left on, and every customer who received one. If either direction depends on a person with institutional memory, you do not have traceability, you have a person.

Make it a report rather than a procedure. The artefact is a single traceability report you can run from a serial or a lot and hand over as it comes out, timestamped, showing both directions on one page. A procedure describing how somebody would gather the evidence is a promise. A report you can produce in the room is the evidence.

Rehearse it as a mock recall before anyone asks. Pick a shipment from six months ago, pick a serial on it, and time yourself. What breaks is always specific and always fixable: a lot number nobody recorded at receipt, a certificate filed under a purchase order number instead of the lot, consumption posted in bulk against the job so the particular heat cannot be identified, serials assigned at shipping rather than at build. Fix the capture point, not the report. Then run the drill again on a different part and a different supplier until it comes out the same way twice, because the drill is the only honest measure of whether the records hold under weight.

What Good Looks Like

You can produce a both-directions traceability report for any serial on any shipment in minutes, straight from the system, with nobody phoned and nothing retyped. Rehearsed on a part nobody picked in advance.

Frequently Asked Questions

How far in advance should I prepare for an audit?

If preparation means assembling evidence, no amount of lead time fixes it. Spend the weeks before the date on rehearsal instead: pull parts at random, trace them, and find the capture points that fail. The preparation that actually pays off happened months earlier, when you decided to record inspection on the operation rather than in a parallel log.

What records do auditors ask for most often?

Calibration records for the gauges you measured with, training and competence records, inspection results tied to specific parts, nonconformance reports with their dispositions, corrective actions with evidence that they worked, supplier approval and incoming material certificates, and change control showing which revision was in effect when. The shape never varies: a requirement, the record, and the date.

How long do I have to keep quality records?

There is no single number, and anyone offering you one is guessing. Retention comes from three places: the standard you are certified to, any regulator with jurisdiction over your product, and the quality clauses in your customer contracts. Take the longest of the three for each record type and write the source beside it on your requirement map.

Can software make my shop ISO certified?

No. Certification is granted to an organisation after an audit of its processes, never to a tool it happens to use. Software can make compliant practice cheaper by capturing evidence where the work happens and keeping revisions instead of overwriting them, but the certificate belongs to the shop. Treat any claim that a product is itself certified as a reason to ask harder questions.

What is the difference between a mock audit and a mock recall?

A mock audit tests whether your processes match what your documentation says they do. A mock recall tests whether your records can actually locate material: take a lot, trace it back to its receipt and certificate, then forward to every shipment it reached. Run both. The mock recall is harsher, because it cannot be talked through.