What Makes Up The Rate
Depreciation$11.00
Labor$36.00
Overhead$9.00
Maintenance$4.00
Power$2.00
How The Rate Is Built

Machine Rate = (Depreciation + Labor + Overhead + Maintenance + Power) ÷ Annual Run Hours

Rate one machine, because a five-axis and a manual lathe do not cost the same to own. Annual Run Hours is billable spindle time, not the hours the building is open; an optimistic figure spreads depreciation, Allocated Overhead and Annual Maintenance too thin and quietly undercharges every quote. Purchase Price minus Salvage Value over Useful Life gives the depreciation the machine owes each year. Operator Wage carries Labor Burden on top and is charged for every run hour, so halve it if one person tends two machines. Target Margin is divided out of cost to give the sell rate, not added to it.

Depreciation(Purchase − Salvage)÷ Useful Life ÷ Run Hours
LaborWage × (1 + Burden)charged while the machine runs
Sell RateCost ÷ (1 − Margin)what the quote has to carry
Frequently Asked Questions

Why does the sell rate jump when margin rises?

Because margin is divided out, not added on. The sell rate is cost divided by one minus Target Margin, so 25 percent margin means cost divided by 0.75, which is more than cost plus 25 percent. The input is capped at 95 percent because dividing by zero has no sell rate.

What annual run hours should I enter?

The hours the machine will actually be running work you can bill, after changeovers, breakdowns, lunch and the weeks the queue is thin. It is the most sensitive input on the page, because depreciation, overhead and maintenance are all divided by it. Use last year's recorded hours if you have them.

Should I use book depreciation or replacement cost?

The calculator uses straight-line book depreciation: Purchase Price minus Salvage Value, over Useful Life. If you intend to replace the machine, enter what the replacement will cost instead of what you paid, because the rate has to fund the next machine rather than the last one.

What is the difference between cost per hour and sell rate?

Cost per Hour is what the hour consumes; Sell Rate is what you have to charge to keep your target margin on it. Quoting at cost per hour books the job at break-even before a single problem, and problems are not optional. Quote the sell rate and track variance against cost.

Where does power draw belong in the rate?

Power is Power Draw times Power Cost, charged per running hour, so it does not depend on annual hours the way overhead does. Use the average draw across a cycle rather than the nameplate kilowatts, since a spindle at full load is not how the machine spends most of its day.

What is a machine hourly rate?

It is what one hour on a given machine costs you to own and run, including depreciation, the operator, allocated overhead, maintenance and power. Quoting below it means the job loses money even when it looks profitable on material.

Why does every machine need its own rate?

A five-axis and a manual lathe do not cost the same to own, staff or maintain. Using one blended shop rate overcharges the cheap work and undercharges the expensive work, which is how shops end up busy and unprofitable.

Should labor be in the machine rate?

If an operator is tied to the machine while it runs, yes. If one person tends four machines, split the burdened wage across them rather than charging it four times.

How often should the rate be updated?

At least annually, and any time run hours, wages or power costs move materially. Run hours matter most: the same annual cost over fewer hours raises the rate on every quote.