Job Cost Calculator
Material, setup, run time, and markup in one quote.
Multiplied by the number of operations below
Multiplied by the number of operations below
Quote Price
$5,963.54167
Price Per Part
$59.63542
Total Cost
$4,770.83333
Cost Per Part
$47.70833
Markup
$1,192.70833
Margin
20.0%
Quote = (Material + Setup + Run + Secondary) × (1 + Markup%)
Cost one job at one quantity, because setup spread over a hundred parts is a different number than setup spread over ten. Material Cost Per Unit is the cost of the stock you buy, including drop and offcut, not the finished weight. Setup Time Per Operation and Cycle Time Per Part are both multiplied by Number of Operations, so enter the average across operations rather than the longest one. Shop Rate has to be a rate that already carries machine, labor and overhead; a bare wage undercharges every hour. Markup is added to cost, so the margin card will read lower than the markup you entered.
Why is my margin lower than the markup I entered?
Because markup divides by cost and margin divides by price. A 25 percent markup on cost produces a 20 percent margin on the quote, since the calculator adds markup to total cost and then reports margin as markup divided by quote price. Enter the markup you intend to charge.
What should the shop rate actually include?
Everything an hour on the floor costs you to provide: machine ownership, the operator at a burdened wage, allocated overhead, maintenance and power. If your shop rate is a wage plus a guess, every hour you quote is short. Work the rate out per machine rather than blending the whole shop.
Does setup get amortised across the whole quantity?
Yes, within this quote. Setup is costed once per operation and lands in total cost, so cost per part divides it across the quantity you entered. Quote a quantity you will actually run in one go; splitting the order into two releases means you pay setup twice and the per-part cost is wrong.
How do I handle operations with different cycle times?
The calculator applies one setup time and one cycle time to every operation, so enter a weighted average when they differ. If one operation dominates the job, cost that operation at its own rate and quantity, then add the rest through Secondary Ops Cost as a per-unit figure.
What is the difference between cost per part and price per part?
Cost per part is total cost divided by quantity and it is what the job consumes. Price per part is the quote divided by quantity and it is what the customer pays. The gap between them is your markup. Compare cost per part against your last run of the same part before you send the quote.