Choosing Manufacturing ERP
How to run an evaluation that ends in a decision instead of another round of demos.
This guide assumes you have already sat through the demos and liked them. It will not rank vendors, score products, or tell you what to buy. It is a method for turning a stalled evaluation into a decision you can still defend in a year. Evaluations almost never stall because a feature is missing. They stall because nobody wrote down what better means before the first demo, so every system looks capable and none looks necessary. Four steps: name the problem in money, score requirements you wrote yourself, demo your own parts, and call references who look like you.
Work out what you are actually solving
Before you look at another system, write down the three things that cost you real money right now. Not ten. Three. For most shops they come off the same short list: deliveries that ship late, quotes that win work at a loss, and inventory counts nobody trusts enough to act on.
Then attach a number to each one. Late deliveries: how many jobs shipped past the promise date last quarter, and what the expedited freight, the overtime and the one lost customer cost you. Quotes: how many jobs closed below the margin you quoted, and by how much. Inventory: how often a job stops because material the system says is on the shelf is not there, and what the rescheduling costs in a month. Frequency is a fine substitute when you cannot price something. Twice a week is a number. Painful is not.
Visibility is not a problem statement. Neither is efficiency, growth, or scalability. Each describes a feeling, and a feeling cannot be tested in a demo or measured after go-live, so you will never know whether the software fixed it. If the sentence you wrote could be said by any manufacturer in any industry, it is too vague to buy against. Push until it names a part, a customer, a department, or a dollar figure.
Do this with the two or three people who live inside each problem, separately, before you compare notes. Purchasing and the shop supervisor usually name different root causes for the same late job, and that disagreement is worth more than a consensus you manufactured in a meeting.
Finish with one page: three to five problems, each with a monthly cost or a frequency beside it, agreed by the people who raised them. That page is now your scoring sheet, your demo script and your business case.
Hand your one-pager to someone who does not work there. If they cannot tell you which number should move after go-live, and roughly by how much, you have written complaints rather than problems and you are not ready to score anything.
Build a requirements list you can score
Turn the one-pager into requirements before any vendor sees it. Write each one as something a person does on a Tuesday, not as a feature name. Quote a machined part from a customer print in under twenty minutes is a requirement. Quoting module is a shopping list item, and every vendor ticks it.
Split the list in two now, not during a demo. A must-have is something you would walk away over: if the system cannot do it, the deal is dead regardless of price. Everything else is a nice-to-have. Be honest, because a list where every row is a must-have cannot choose for you. Most shops land on fifteen to twenty-five must-haves with their preferences sitting underneath.
Weigh the must-haves against the problems from the first chapter. A requirement that does not trace back to a problem with a number beside it is somebody's taste, and it belongs below the line or off the list entirely.
Fix the scoring before the first call. One scale, one named scorer per row, the same questions asked in the same order of every vendor. Zero means it cannot do this. One means it can with configuration or custom work. Two means it does this out of the box today. Write the evidence next to the score, including which screen you saw it on, so the number survives a week of other demos.
Do not download a three-hundred-row requirements template. Nobody weighted those rows, most of them describe an industry you are not in, and the total ends up measuring breadth rather than fit. A list you wrote from your own problems is shorter and actually separates the vendors.
The artefact is one scoring sheet: weighted must-haves, nice-to-haves below the line, a column per vendor, filled in by you rather than by a sales engineer.
Cover the vendor names on the finished sheet and hand it to a colleague. If they can still guess which demo you enjoyed most, you scored the pitch rather than the requirement. Every row should trace to a problem with a number.
Run demos against your own parts
A canned demo tells you nothing. The data is clean, the routing has three operations, nothing is late, and the salesperson has run that script two hundred times. You learn how good the demo is, not whether the system fits your work.
So send the material ahead. One real print, including the awkward tolerance and the customer note in the corner. One real bill of materials, with the purchased part that has two approved suppliers and the sub-assembly you make in batches. One real routing, with the outside process in the middle, because outside processing is where most systems get vague. Ask them to quote that part, schedule it against a week you already have loaded, and show the cost against the estimate after it runs. Live, on the call, with your data.
Watch what they skip. If they quote the part but switch to sample data before costing it, that is your answer about costing. If the scheduler opens on an empty week, ask them to keep loading it until something conflicts, then watch how the conflict gets resolved. The interesting part of any system is what it does when the answer is no.
Insist on the operator screen. Most of the demo will be manager dashboards, because dashboards demo beautifully, while most of the daily typing happens on the floor. Ask to see clocking onto a job, reporting a quantity, flagging a scrap part and finding the current revision of a drawing, at the speed and on the device a machinist would actually use. If that screen needs a mouse, a keyboard and four clicks, nobody will use it and your data will be wrong within a month.
Collect the same three artefacts from every vendor: the quote they produced for your part, your loaded week on their schedule, and the cost comparison after the job. Those compare. Impressions of a demo do not.
Ask each vendor for the quote, the loaded schedule and the job cost they built from your print. A vendor who sends all three inside a day is showing you the implementation you are going to get.
Check references that match your shop
Every vendor will offer references, and every reference they offer is happy. That is fine. The question is whether the happy customer looks anything like you.
Ask for a specific shape, in writing, before they choose who to call. Roughly your headcount, within a factor of two. Your process mix: if you run machining, welding and a paint line, a reference who only assembles purchased parts cannot tell you how routings held up. Your order pattern, because a make-to-order shop working from customer prints has nothing in common with one running the same forty stock items. The same country, if payroll, tax or compliance matter to you. A two-thousand-person plant with an IT department and a full-time administrator tells a thirty-person shop nothing, however glowing it is.
Then ask about the bad month. Every implementation has one: the week inventory was wrong, the month the schedule got abandoned, the go-live that slipped a quarter. Ask what broke, who fixed it, how long it really took against the plan, and what they would sequence differently. A reference who says the whole thing went smoothly is either a very unusual shop or a coached one, so follow up: what did you switch off and come back to later.
Ask the things a vendor cannot answer for them. How long from signing to the first real order going through the system. Who picked up the phone when something broke after the project team moved on. What the operators say about it now, a year and a half in. And the question that sorts everything: knowing what you know now, would you buy it again, and what do you wish you had known.
Write the answers down the same way for every call. Two matched references per finalist, same questions, is enough to decide on.
A reference is usable when they volunteer something that went wrong without being pushed. If both references for a vendor describe a painless project, you are talking to showcase accounts rather than to ordinary customers.
How long should an ERP evaluation take?
Plan six to twelve weeks, and expect most of it to be your work rather than vendor time. Two weeks to write the problem page and the scoring sheet, three or four weeks of demos run against your own parts, two weeks of reference calls, then decide. An evaluation that drifts past six months usually never started, because nobody defined better.
Who should be involved in choosing an ERP?
The people who will type into it every day, plus whoever signs. For most shops that is five or six: the estimator, the scheduler, whoever buys material, one machinist or assembler, the person who closes the books, and the owner. Any larger and you get a committee that negotiates feelings instead of scoring rows against problems.
What should I ask an ERP vendor before buying?
Three questions get skipped and matter most. Who actually does the implementation work, named, and how many hours of it are mine. What happens at renewal if my headcount or order volume doubles. How do I get my data out, in what format, without asking you first. Ask all three in writing and keep the answers.
Is industry-specific ERP better than general ERP?
It depends on whether your must-haves are industry-shaped. If lot traceability, certificate capture, serial genealogy or a customer quality standard sit near the top of your list, a general system will need custom work to reach them. If your must-haves are quoting, scheduling and costing, plenty of general systems do those well. Let the scoring sheet answer it.
What do I do if two systems score the same?
Break the tie on things the sheet handles badly. Which operator screen your floor would tolerate. Which reference actually looked like your shop. Who will still answer the phone in year three. If it is still level, run a short paid pilot on one work cell with real jobs, and let the pilot decide rather than another demo.
Getting quotes, jobs, and inventory out of workbooks without losing the history in them.
ERP Implementation in 90 DaysWhat each phase looks like, who owns it, and the decisions that decide whether you go live on time.
Getting Audit ReadyThe records an auditor asks for, and how to keep them as a by-product of running the job.
See it run against your own parts.
Mid-evaluation and stuck between options? Send one real print, one bill of materials and one routing, and watch a quote, a schedule and a job cost come out the other side.