PFMEA Template
Process failure mode and effects analysis, with severity, occurrence and detection scored into an RPN and the actions that bring it down.
Excel workbook, one sheet, fourteen columns with twenty blank rows. Severity, occurrence and detection cells only accept one to ten, and the RPN column is a live formula.
IATF 16949
Process Step And Requirement
The operation under analysis and what it is required to achieve, kept as separate columns so one step can carry several requirements without repeating the step.
Failure Mode And Effect
How the requirement can fail at that step, and what the customer experiences as a result, which is what the severity rating is judged against.
Rated Severity And Class
A severity cell restricted to one through ten, beside a classification column offering Critical, Significant, Key and Standard for characteristics that need special controls.
Cause And Occurrence
The mechanism that produces the failure mode and how often it is expected, rated one through ten. Causes are stated at the level you can act on rather than as operator error.
Prevention And Detection Controls
Two separate columns, because they are not the same thing. Prevention stops the cause, detection catches the result, and only detection drives the detection rating.
RPN Formula
Severity times occurrence times detection, calculated by the sheet as soon as all three ratings are entered, so the arithmetic is never done by hand.
Action And Results
Recommended action with responsibility and target date, plus a section for the action taken and the re-rated severity, occurrence and detection. An action with no re-rating is not closed.
The three AS9102 forms: part number accountability, raw material and special process certification, and characteristic accountability ballooned to the drawing.
Control Plan TemplateThe IATF 16949 control plan format: characteristic, specification, measurement method, sample size and frequency, and the reaction plan when it goes out.
How do I rate severity, occurrence and detection?
All three run one to ten, where ten is worst: most severe effect, most frequent cause, least likely to be detected. Use your organisation's rating tables so the numbers mean the same thing across analyses. The template restricts the cells to one through ten so a typo cannot inflate an RPN.
Is RPN still the right way to prioritise?
It is widely used and this template calculates it, but treat it as a sort key rather than a verdict. A severity of nine with a low RPN still deserves attention, because RPN lets a low occurrence hide a serious effect. Many teams now screen on severity first, then use RPN within each severity band.
What is the difference between prevention and detection controls?
Prevention acts on the cause so the failure mode does not occur, such as a fixture that only accepts the part one way. Detection acts after the fact and catches the failure before it moves on, such as a gauge or a vision check. Only detection controls lower the detection rating.
How is a PFMEA different from a control plan?
The PFMEA is the analysis and the control plan is the output. The PFMEA works out what can fail, how badly, and how likely you are to catch it. The control plan records what you will actually measure and how often. Every detection control here should appear there.
When should a PFMEA be revisited?
On any process change, a new failure seen in production, a customer complaint, or a corrective action that changes a control. It is a living document, which is why the template carries revision and date-revised fields in the header rather than only a date originated.
Keep the record, not the spreadsheet.
See how WorkCell produces this report from the work your shop already did.