[Platform]

Engineering

Where a part becomes a definition the rest of WorkCell can build from: the item and its revisions, the bill of materials, and the routing naming a process and a resource per operation. It stops at the released definition. Production runs it.

WorkCell TeamPublishedUpdated
Engineeringitems, BOMs, routings, revisions

Most shops keep the definition of a part in three places at once: a drawing in a folder, a parts list in a spreadsheet, and the sequence of operations in the head of whoever has run it before. Change one and the other two go stale, and a year later nobody can say which version a shipped unit was built to. Engineering holds that definition as records. An item carries revisions as rows of their own, a bill of materials and a routing are versioned against a specific item revision, and revising a released one copies it forward rather than overwriting it. Every work order released downstream points at the version it was built from.

What It Does
01

Items And Revisions

Every item carries its revisions as their own records, each with a revision label, a status moving draft to active to obsolete, effectivity dates and a standard cost. The item points at its current revision, so history is a row rather than an overwrite.

02

Versioned Bills Of Materials

A bill of materials belongs to one item revision and carries an integer version, a draft-to-released status and an effectivity window. Revising a released bill copies it into a new draft one version higher, with the previous version left intact.

03

Routings And Operations

A routing is a sequence of operations, each pointing at a process and the resource that runs it, with setup, run and teardown minutes, crew size, scrap percent and flags for subcontracting, inspection and backflush.

04

A Reusable Process Library

Processes are defined once on the Processes screen with a code, a name and an outside-processing flag, then referenced by routing operations across every part. Refining a process does not mean editing the same description on forty routings.

05

Resources And Resource Groups

Resources on the Resources screen are typed machine, labor, cell, tool or outside, and carry capacity, an efficiency percent, setup, run and burden rates, a site and an area. Resource groups collect them for routing and reporting.

06

Rolled-Up Cost Per Revision

Costing reads the released bill of materials and routing for an item revision and returns material, labor and burden for a given quantity, line by line, alongside on-hand, reserved and available so you can see whether the parts exist.

Frequently Asked Questions

Can I revise a bill of materials that is already released?

Yes, and that is the only way to change one. Revising a released bill copies it into a new draft at the next integer version, pointed back at the bill it came from, leaving the released version untouched. You edit the draft, release it, and the earlier version remains on record as what earlier units were built from.

How is a change to a released definition controlled?

By revision and by date. Items, bills of material and routings each move from draft to released to obsolete, a release supersedes the version before it, and effectivity dates decide which version applies when. Role permissions decide who can revise a structure and the change is audited. The review and authorisation step itself happens outside WorkCell.

What is the difference between a process and a routing operation?

A process is the reusable definition of a step, held once with a code, a name and an outside-processing flag. A routing operation is that process placed in a specific sequence for a specific item revision, carrying the resource, the setup and run minutes, the crew size and the scrap percent for that part. One process serves many operations.

Does a routing operation have to name a machine?

A process is required on every routing operation; the resource is optional. An operation with no resource still sequences and still costs through the process, but it contributes no machine load, because load is derived from the resource the operation names. Scheduling is only as good as the resources the routing points at.

Can a bill of materials line be tied to one operation?

Yes. A bill of materials line can reference a routing operation, which is how material is attached to the step that consumes it rather than to the part in general. When the work order is released, that line becomes a material requirement hung on the matching work order operation instead of on the order as a whole.

[Platform]

One database, every module.

Send us one assembly with its parts list and its operation sequence, and we will show you exactly how it lands as an item, a bill of materials and a routing.