First article inspection (FAI) is the documented verification that a production part meets every dimension, note, and requirement on its drawing, performed on the first piece produced by the released process, tooling, and operators that will make the rest of the run.
First article inspection (FAI) qualifies a process, not a part. The drawing is ballooned so every dimension, note, material call-out, finish, and tolerance carries a number, and the report records one line per number with the requirement, the method used to measure it, the actual value found, and the result. The article itself has to come off the production setup: production tooling, production fixtures, the released program, production material, and the operator who will run the job. A part cut on a different machine, or dressed by hand on the bench, is not a first article even if it measures perfectly, because the thing being proven is repeatability of the setup rather than the existence of one good piece.
The report is the deliverable. It identifies the part and revision, accounts for every ballooned characteristic, ties material and special process work such as heat treat, plating, or welding back to the certifications and the approved sources that performed it, and carries any required functional or performance test results. In aerospace, AS9102 is the standard reporting format, and its forms cover part accountability, material and special-process certification, and characteristic verification. Automotive customers generally want the same evidence inside a production part approval submission instead. Everywhere else the purchase order or the customer's quality clause defines the format, and the obligation is the same whatever the paperwork is called.
An FAI is required on a new part number, at a new supplier, after a drawing revision that changes a characteristic, and after any change of manufacturing location, process, tooling, or material. A long gap in production triggers one because the process is no longer proven, and so does a corrective action that altered the process. A partial or delta report covers only the characteristics the change touched and references the previously approved full report.
The mistake practitioners make most is confusing first article with first piece. First-piece inspection is a short setup check an operator runs at the start of every job against a few key characteristics; FAI is the one-time, full qualification that becomes a contractual baseline. The rest of the failures are mundane and expensive: measuring with gauges that have no current calibration record, recording acceptable instead of the actual reading, ballooning reference dimensions as though they were inspected, and submitting a report from a part that was quietly tweaked. The customer keeps that report for years and compares later production against it, so a wrong number entered once outlives the job it came from.
A machine shop wins a 2,000-piece order for an aluminum housing with 68 ballooned characteristics. It runs the first piece on the production cell with the production fixture and the released program, then measures all 68: 61 on a CMM, 5 with thread gauges, and 2 surface-finish readings on a profilometer. Two features fall outside tolerance, a 12.05 mm bore against 12.00 plus 0.03 and a missing chamfer. The program is corrected, a second article is run, and the report is resubmitted showing 68 of 68 conforming.
What is the difference between first article and first piece inspection?
First-piece inspection is a setup check an operator runs at the start of every job against a handful of key characteristics to confirm the machine is making good parts. First article inspection is a one-time, full verification of every drawing characteristic that qualifies the process itself, and it produces a report the customer keeps on file.
When is a first article inspection required?
On a new part number, at a new supplier, after a drawing revision that changes a characteristic, and after a change of manufacturing location, process, tooling, or material. A long production gap triggers one, as does a corrective action that altered the process. A partial or delta report can cover only the characteristics the change touched.
What goes into a first article inspection report?
Part and revision identification, the ballooned drawing with every characteristic numbered, one line per characteristic giving the requirement, the measurement method, the actual value, and the result, plus material and special process certifications traced to their sources and any functional test results. Actual readings, never the word acceptable.
Does a passing FAI mean the whole run is good?
No. An FAI qualifies the process at one point in time on one part. Tool wear, material lot changes, fixture drift, and operator changes all happen afterward, which is why in-process inspection, first-piece checks, and statistical process control carry the rest of the run. The FAI is the baseline, not the guarantee.
Who keeps the first article inspection records?
Both parties. The supplier retains the report, the ballooned drawing, the raw measurement data, the calibration records for the gauges used, and the certifications, for the retention period the contract or quality system sets. The customer keeps the approved copy as the baseline it compares later production and any delta submission against.